STATUS OF INFRANSTRUCTURE IN JNV”S

 


I


Area of land allotted (in area): 30 Acre: 
Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on



: 30 Acre
: Yes.

: Jun 2003



II


Status of Boundary Wall
a. Brick Wall

b. Barbed wire fencing


: Completed

Bricked Wall along with barbed wire.
III

Permanent buildings constructed

: CPWD Pattern


IV

School building


: Completed.

v

Dormitories


: Boys 02 Nos (Capacity 384 Students)
With Warden Residence 8  Nos.

: Girls 01 Nos (200Students)
With Warden Residence 04 Nos.


Vi

Kitchen/dining Hall

No. of shifts required for all students to take food

: Completed. Area 757 Sq. Mtr

: One shift

Vii

Principal Residence


: 01 No.

Viii

Principal Residence


: Type IV – 01
: Type III =  28 Nos
: Type II = 06 Nos
: Type I =  06 Nos

: SP Sheds converted into Staff Qtrs :  0 Nos

ix

M.P.Hall


: Not available

x

Workshop


: Not Available

xi

Type of O.H. tank
Its Capacity

Present Status

: Column based
: 75,000 Liters

: Working satisfactory.

xii

U.G. tank
Its Capacity

Present Status


: 1,25,000 Liters

: Working satisfactory.

xiii

D. G. Set


: Available.
:  Kirloskar Make
: 25 KV
: Working

: Year of Procurement - 2010

xiv

Sewage Pump


:   -- H.P. Not Available

xv

Water   Pump


: Capacity.  5 H.P

xvi

Electrification
Electric connection

Sub Station building Street lighting

Numbers of hrs. during day when power supply is available on an average

: Rural Feeder
: Completed
: 03 Nos. of Poles

: 12 hrs.


xvii

Playfields
400 meter rack
40 x 30 meter basket ball court

40 x 30 meter Volley ball court

: Available


xviii

Water Supply
Tube well
Hand Pump

Connection from PHED


: Potable, 01 Nos. Working.
: NA

: 0 hours supply in a day

xix

Rajiv Gandhi Smriti Van

: Available


xx

Fire Fighting arrangement


: Available


xxi

Last Date of cleaning of
(a) Septic Tank

(b) Water Tanks


: May 2012

: May 2012


xxii

Whether area around transformer is fenced


: Yes.


xxiii

Whether open wells, if any, are covered from top


: Yes.


XXIV

Works taken up under M&R fund during current year and last year:-


Year

Name of work (M&R)


Expenditure (Rs. In lacs


Cumulative expenditure during the year


2010-11

Painting Work


Rs.1.93




2011-12

Painting Work


Rs. 2.05